欧美中文字幕一区二区三区 I 欧美激情一区二区三区在线观看 I 免费视频一区二区 I 亚洲日本不卡 I 日本一本一区二区免费播放 I 三级毛片av I xxxxcom日本 I 14美女爱做视频免费 I 91五月色国产在线观看 I 色偷偷免费费视频在线 I 激情xxx I 国产精品卡一 I 亚洲综合激情五月久久 I 久久成人久久爱 I 成 人 网 站国产免费观看 I 黄色av片在线观看 I 亚洲暴爽av I 欧美福利视频一区二区三区 I 国产艳妇av在线观看果冻传媒 I 天天躁日日躁狼狼超碰97 I 男女18禁啪啪无遮挡 I 乱码卡一卡二新区网站 I 日本a在线免费观看 I 自拍 亚洲 欧美 卡通 另类 I 永久黄网站色视频免费观看 I 疯狂三人交性欧美 I 中文字幕乱码亚洲∧v日本 I 美女张开腿黄网站免费 I 伊人福利 I 中文国产成人精品久久久 I 成人免费区 I 国产xxxx裸体肉体大胆147 I 涩涩视频网站在线观看 I 欧美老少做受xxxx高潮 I 成人黄色激情电影

歡迎光臨河北漢洋機械制造有限公司網站!
誠信促進發展,實力鑄就品牌
服務熱線:

15531706865

產品分類

Product category

新聞資訊 / news 您的位置:網站首頁 > 新聞資訊 > Construction/ Nomenclature

Construction/ Nomenclature

發布時間: 2020-02-13  點擊次數: 1306次

Caution: Always wear the appropriate protective gear (safety glasses, gloves, safety shoes,
etc.) when working.
TKP35H22 (Formerly TKP0350)
Point of separation
Moving end bracket
Arm
Horizontal divider
Fixed end bracket
Vertical divider
Link
3. Open the arms from each link on either side of the section to be disassembled.
2. Insert a flat-head screwdriver into the gap between links and twist in the direction of the arrow to remove the pin from the hole.
1. Support the other pins and bend the Cableveyor as shown to separate the ends.
3. Align the ends. 2. Overlap the links, and insert the pins into the hole on one side.
1. Push in the other side, insert the pin, and connect.

 
2
 
 
 
1) Opening arms             2) Removing or attaching arms       3) Closing arms
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Attach vertical dividers when filling your Cableveyor with cables & hoses. With the arms open, attach the vertical dividers as follows. 1. Hook one of the catches on the end of the vertical divider into the link. (circled red in photo on right) 2. Snap in the other catch by pushing the divider down in the direction of the arrow.
 
*Either end of the vertical divider can be used. *Insert horizontal dividers into the vertical divider holes first, and then attach the unit to the link. (Note: This will require more than one vertical divider.)
 
 
 
 
Pretension and sag may appear in the free span depending on the application. However, if selected within Tsubaki’s performance graph then there will be no problems with use.
 
 
 
 
 
 
 
 
1. Machine travel end installation height (H’) should be Cableveyor height H + (10-30). 2. Cableveyor space height (h) is H + 100. 3. Install a guide rail. 4. The difference (ε) in the travel end and fixed end bracket attachment sides should be less than 4mm.  5. Use travel cables/hoses with excellent bending and wear properties. 6. Avoid using cables/hoses with wire braiding, as they are easily damaged.
7. Cables/hoses wear easily when used stacked onto of one another. Lay horizontally or use horizontal dividers. 8. Set cables and hoses in the Cableveyor so that they have some play, and clamp both ends. 9. Remove foreign objects from guide rails, as they may cause damage. 10. The following are shipped unassembled and will require assembly when installing the Cableveyor.  (Moving/fixed end) plastic brackets  Vertical/horizontal dividers
 
Any unevenness on the plastic bracket installation surface may damage the bracket. Ensure that the installation surface is as smooth as possible. Over-tightening the installation bolts can also damage the plastic bracket. Please use the following recommended tightening torque.
 
Bolt Size Recommended Tightening Torque M6 2.6 N?m